设为首页收藏本站

科技论坛

 找回密码
 注册
科技论坛 门户 新能源 水力发电 查看内容

24英尺30英寸宽的水车

2018-4-22 21:49| 发布者: dymodel| 查看: 197| 评论: 0|原作者: fish

摘要: 24英尺30英寸宽的水车 24 foot 30 inch wide waterwheel April 2007 All New Outer Bucket sections replaced Dual Coat Powder Coating metal finish Ragsdale Mill has been in operation during the c ...
24英尺30英寸宽的水车
24 foot 30 inch wide waterwheel
April 2007
All New Outer Bucket sections replaced
Dual Coat Powder Coating metal finish

水力发电
Ragsdale Mill has been in operation during the civil war. It is located about 7 miles north of Homer GA.

Fitz Waterwheel Company replaced the old wheel was a new waterwheel back at the turn of the century
水力发电

The axle, hubs and the spokes after all this time were in good operational shape to be used again. The outer bucket section had seen a better day with major rust setting in. Up through the 1950's this mill was still in operation.
水力发电

水力发电

The process of cutting out the old outer rim section began. 
 
As each old section was removed a newer bucket section was put in place.

鲜花

握手

雷人

路过

鸡蛋
上一篇:水车设计下一篇:水轮机(俄文)

辽公网安备 21100402204006号|科技论坛 ( 辽ICP备07501385号-1   

GMT+8, 2018-11-16 14:02

Powered by tech-domain X3.4 Licensed

© 2001-2017 Comsenz Inc.

返回顶部